[
https://issues.apache.org/jira/browse/AMBARI-21709?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Andrii Tkach updated AMBARI-21709:
----------------------------------
Resolution: Fixed
Status: Resolved (was: Patch Available)
> Finalize Warns that it is Permanent Even For PATCH Upgrades
> -----------------------------------------------------------
>
> Key: AMBARI-21709
> URL: https://issues.apache.org/jira/browse/AMBARI-21709
> Project: Ambari
> Issue Type: Bug
> Components: ambari-web
> Affects Versions: 2.5.3
> Reporter: Andrii Tkach
> Assignee: Andrii Tkach
> Priority: Critical
> Fix For: 2.5.3
>
> Attachments: AMBARI-21709.patch, Screen Shot 2017-08-03 at 2.01.52
> PM.png
>
>
> Perform either a {{PATCH}} or {{MAINT}} upgrade and get to Finalize. The
> upgrade wizard warns that finalization is permanent.
> {quote}
> Your cluster version has been upgraded. Click on Finalize when you are ready
> to finalize the upgrade and commit to the new version. You are strongly
> encouraged to run tests on your cluster to ensure it is fully operational
> before finalizing. You cannot go back to the original version once the
> upgrade is finalized.
> {quote}
> This is not true for certain upgrade types. Finalization is a required step,
> yes, but you can still revert {{PATCH}} and {{MAINT}} upgrades that have
> finalized. The message for these types should read something like:
> {quote}
> The {{PATCH}} upgrade to HDP-2.5.4.0-1234 is ready to be completed. After
> finalization, the patch can be reverted from the Stacks and Versions page if
> it is no longer required."
> {quote}
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)