[
https://issues.apache.org/jira/browse/BEAM-6106?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16695336#comment-16695336
]
Ahmet Altay commented on BEAM-6106:
-----------------------------------
Rollback and cherry pick to release branch are completed.
Keeping it open and assigning to the PR author for the fix and undoing the
revert on master branch.
> test_bigquery_tornadoes_it fails due to a hash mismatch
> -------------------------------------------------------
>
> Key: BEAM-6106
> URL: https://issues.apache.org/jira/browse/BEAM-6106
> Project: Beam
> Issue Type: Bug
> Components: sdk-py-core
> Reporter: Chamikara Jayalath
> Assignee: Robbe
> Priority: Major
> Fix For: 2.10.0
>
> Time Spent: 1h 20m
> Remaining Estimate: 0h
>
> For example,
> [https://builds.apache.org/job/beam_PostCommit_Python_Verify/6626/console|https://builds.apache.org/job/beam_PostCommit_Python_Verify/6626/consoleFull]
>
> *09:32:19* Expected: (Test pipeline expected terminated in state: DONE and
> Expected checksum is 83789a7c1bca7959dcf23d3bc37e9204e594330f)*09:32:19*
> but: Expected checksum is 83789a7c1bca7959dcf23d3bc37e9204e594330f Actual
> checksum is d860e636050c559a16a791aff40d6ad809d4daf0
>
> Root cause seems to be a hash function change in
> https://github.com/apache/beam/pull/7029
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)