[ 
https://issues.apache.org/jira/browse/BEAM-10517?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Kenneth Knowles updated BEAM-10517:
-----------------------------------
    Summary: DirectRunner multi step combine drops null accumulators  (was: 
DirectRunner multi step combine crashes on null accumulator)

> DirectRunner multi step combine drops null accumulators
> -------------------------------------------------------
>
>                 Key: BEAM-10517
>                 URL: https://issues.apache.org/jira/browse/BEAM-10517
>             Project: Beam
>          Issue Type: Bug
>          Components: runner-direct
>            Reporter: Kenneth Knowles
>            Assignee: Kenneth Knowles
>            Priority: P1
>          Time Spent: 10m
>  Remaining Estimate: 0h
>
> When outputting accumulators in pre-combine, the direct runner iterates over 
> a map of accumulators. However, since an accumulator can be null (such as in 
> zetasketch) these accumulators will not be output.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to