[ 
https://issues.apache.org/jira/browse/CALCITE-2470?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16624802#comment-16624802
 ] 

Vladimir Sitnikov commented on CALCITE-2470:
--------------------------------------------

[~julianhyde], {{shouldMergeProject}} is really hard to use.
Note: org.apache.calcite.tools.PigRelBuilder extends RelBuilder, however  
PigRelBuilder is placed in exactly the same package as 
org.apache.calcite.tools.RelBuilder.

It will cause split-packages kind of issue (the same package name is reused for 
different jars).

Note: {{relBuilder.cluster}} and {{relBuilder.relOptSchema}} are NOT accessible 
from a derived class that is located in different package.

> RelBuilder.project should combine expressions if underlying node is a Project
> -----------------------------------------------------------------------------
>
>                 Key: CALCITE-2470
>                 URL: https://issues.apache.org/jira/browse/CALCITE-2470
>             Project: Calcite
>          Issue Type: Bug
>            Reporter: Julian Hyde
>            Assignee: Julian Hyde
>            Priority: Major
>             Fix For: 1.18.0
>
>
> The {{RelBuilder.project}} method should combine expressions if underlying 
> node is a {{Project}}.
> For example, if {{r}} is a {{RelBuilder}} and its stack initially contains
> {code:java}
> Project(Scan(T), a, b, a + b as c){code}
> and we call (in pseudo-code)
> {code:java}
> r.project(a + c as d){code}
> then the result should be
> {code:java}
> Project(Scan(T), a + (a + b) as d){code}
> Today the result is
> {code:java}
> Project(Project(Scan(T), a, a + b as c), a + c as d){code}
> In some circumstances the result will be larger (i.e. contain more 
> {{RexNode}} instances) but much more frequently the result will be smaller 
> and simpler.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to