https://issues.apache.org/jira/browse/DRILL-2026?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14715669#comment-14715669
 ] 

Andrew commented on DRILL-2026:
-------------------------------

I created parallel classes because I was testing and benchmarking the new 
against the old and wanted to run them side by side. I agree that the patch 
should ultimately be a rename of existing classes, rather than a copy. There 
will not be duplicate code in the final iteration. The patch is just to show my 
initial thoughts.

> Consider: speed up dev. tests using Maven "integration-test" phase
> ------------------------------------------------------------------
>
>                 Key: DRILL-2026
>                 URL: https://issues.apache.org/jira/browse/DRILL-2026
>             Project: Apache Drill
>          Issue Type: Improvement
>          Components: Tools, Build & Test
>            Reporter: Daniel Barclay (Drill)
>            Assignee: Jason Altekruse
>             Fix For: 1.2.0
>
>
> Because many of our unit test classes (unit tests in the sense of being run 
> by Surefire in Maven's "test" phase) need to have a running Drillbit, then 
> because they are unit tests, each such test class starts up its own Drillbit, 
> taking quite a while, especially considering the aggregate time.
> Consider moving Drillbit-needing tests to be Maven integration tests (run in 
> Maven's "integration-test" phase by Failsafe).
> That would allow for starting up a Drillbit (or multiple Drillbits and other 
> servers) in Maven's "pre-integration-test" phase, using those servers for all 
> tests, and shutting down the servers in Maven's "post-integration-test" phase.
> That should save quite a lot of time--the product of the time per Drillbit 
> startup plus shutdown and the number of test classes changed to integration 
> tests.



--
This message was sent by Atlassian JIRA