[
https://issues.apache.org/jira/browse/FINERACT-722?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Vishwas Babu A J updated FINERACT-722:
--------------------------------------
Summary: Integration test cases fail when run on the 1st of a month (was:
Some Integration test cases fail on the 1st of every month)
> Integration test cases fail when run on the 1st of a month
> ----------------------------------------------------------
>
> Key: FINERACT-722
> URL: https://issues.apache.org/jira/browse/FINERACT-722
> Project: Apache Fineract
> Issue Type: Bug
> Affects Versions: 1.2.0, 1.3.0
> Reporter: Vishwas Babu A J
> Priority: Major
> Labels: gsoc2019
>
> Set the system clock of the machine on which the test cases are run to the
> 1st of any month (say March 1st 2019). Now, running the test cases would
> result in a few failures.
> The cause of each of these failures (likely issues with the test case
> themselves, however, could also be application issues) needs to be analyzed
> and fixed.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)