[
https://issues.apache.org/jira/browse/FINERACT-722?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Michael Vorburger updated FINERACT-722:
---------------------------------------
Fix Version/s: (was: 1.5.0)
1.4.0
> Integration test cases fail when run on the 1st of a month
> ----------------------------------------------------------
>
> Key: FINERACT-722
> URL: https://issues.apache.org/jira/browse/FINERACT-722
> Project: Apache Fineract
> Issue Type: Bug
> Affects Versions: 1.2.0, 1.3.0
> Reporter: Vishwas Babu A J
> Assignee: Ed Cable
> Priority: Major
> Labels: gsoc2019
> Fix For: 1.4.0
>
>
> Set the system clock of the machine on which the test cases are run to the
> 1st of any month (say March 1st 2019). Now, running the test cases would
> result in a few failures.
> The cause of each of these failures (likely issues with the test case
> themselves, however, could also be application issues) needs to be analyzed
> and fixed.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)