Manoj created FINERACT-1152:
-------------------------------

             Summary: Loan Rescheduling: Validation for End date to be on an 
instalment date should consider new Schedule 
                 Key: FINERACT-1152
                 URL: https://issues.apache.org/jira/browse/FINERACT-1152
             Project: Apache Fineract
          Issue Type: Bug
            Reporter: Manoj
            Assignee: Manoj


In Loan Rescheduling while changing EMI, there is a validation for the input 
End date  to check whether End date falls on an installment date.

when multple rescheduling is applied together, for example : extend tenure and 
change EMI, the newly added installment dates cannot be given as end date, As 
the validation consider the current schedule for cheking the validtity of End 
date.

This validation should be changed so that it should consider the future 
schedule ( the Schedule that is generated as result of the rescheduling) for 
the validation.

or remove the validation and take the nearest installment date before  given 
end date as the last installment to be modified.

 



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to