[ 
https://issues.apache.org/jira/browse/FLINK-16122?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17053169#comment-17053169
 ] 

Robert Metzger commented on FLINK-16122:
----------------------------------------

I might need to re-open this ticket: When end to end tests are failing, the log 
upload task is failing (because the e2e logic is just exiting the execution, 
w/o setting the required variables for the log upload)

Potential Fix: check that all variables are set?

Example: 
https://dev.azure.com/rmetzger/Flink/_build/results?buildId=5990&view=logs&j=68a897ab-3047-5660-245a-cce8f83859f6&t=d47e27f5-9721-5d5f-1cf3-62adbf3d115d

> build system: transfer.sh uploads are unstable (February 2020)
> --------------------------------------------------------------
>
>                 Key: FLINK-16122
>                 URL: https://issues.apache.org/jira/browse/FLINK-16122
>             Project: Flink
>          Issue Type: Task
>          Components: Build System, Build System / Azure Pipelines
>            Reporter: Robert Metzger
>            Assignee: Robert Metzger
>            Priority: Major
>              Labels: pull-request-available
>          Time Spent: 20m
>  Remaining Estimate: 0h
>
> This issue has been brought up on the dev@ list: 
> https://lists.apache.org/thread.html/rb6661e419b869f040e66a4dd46022fd11961e8e5aebe646b2260f6f8%40%3Cdev.flink.apache.org%3E
> Issues:
> - timeouts
> - logs not available



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to