[
https://issues.apache.org/jira/browse/HBASE-11164?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14182445#comment-14182445
]
Hudson commented on HBASE-11164:
--------------------------------
FAILURE: Integrated in HBase-TRUNK #5694 (See
[https://builds.apache.org/job/HBase-TRUNK/5694/])
HBASE-11164 Document and test rolling updates from 0.98 -> 1.0; Add note on why
can't go from 0.96 to 1.0 and define what rolling upgrade is (stack: rev
eae0f202cec535bfa0fc8dff1401b7afbe11f33f)
* src/main/docbkx/upgrading.xml
> Document and test rolling updates from 0.98 -> 1.0
> --------------------------------------------------
>
> Key: HBASE-11164
> URL: https://issues.apache.org/jira/browse/HBASE-11164
> Project: HBase
> Issue Type: Sub-task
> Reporter: Enis Soztutar
> Assignee: stack
> Priority: Critical
> Fix For: 0.99.2
>
>
> I think 1.0 should be rolling upgradable from 0.98 unless we break it
> intentionally for a specific reason. Unless there is such an issue, lets
> document that 1.0 and 0.98 should be rolling upgrade compatible.
> We should also test this before the 0.99 release.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)