[ 
https://issues.apache.org/jira/browse/HBASE-13895?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Enis Soztutar updated HBASE-13895:
----------------------------------
    Fix Version/s: 1.1.2

> DATALOSS: Double-assignment ITBLL'ing
> -------------------------------------
>
>                 Key: HBASE-13895
>                 URL: https://issues.apache.org/jira/browse/HBASE-13895
>             Project: HBase
>          Issue Type: Bug
>    Affects Versions: 1.2.0
>            Reporter: stack
>            Assignee: stack
>            Priority: Critical
>             Fix For: 2.0.0, 1.2.0, 1.1.2
>
>         Attachments: hbase-13895_v1-branch-1.1.patch
>
>
> Opening a place holder till finish analysis.
> I have dataloss running ITBLL at 3B (testing HBASE-13877). Most obvious 
> culprit is the double-assignment that I can see.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to