[
https://issues.apache.org/jira/browse/HBASE-19598?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16301493#comment-16301493
]
Balazs Meszaros commented on HBASE-19598:
-----------------------------------------
[~stack] why was this change?
{code:java}
public void shutdownCluster() {
String statusStr = "Cluster shutdown requested of master=" +
this.master.getServerName();
LOG.info(statusStr);
this.clusterShutdown.set(true);
this.master.stop(statusStr); // <-- THIS LINE WAS REMOVED
}
{code}
If I put it back, the test passes.
> Fix TestAssignmentManagerMetrics flaky test
> -------------------------------------------
>
> Key: HBASE-19598
> URL: https://issues.apache.org/jira/browse/HBASE-19598
> Project: HBase
> Issue Type: Bug
> Affects Versions: 2.0.0-beta-1
> Reporter: Balazs Meszaros
> Assignee: Balazs Meszaros
>
> TestAssignmentManagerMetrics fails constantly. After bisecting, it seems that
> commit 010012cbcb broke it (HBASE-18946).
> The test method runs successfully, but it cannot shut the minicluster down,
> and hangs forever.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)