[ 
https://issues.apache.org/jira/browse/HBASE-19598?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16392672#comment-16392672
 ] 

Hudson commented on HBASE-19598:
--------------------------------

FAILURE: Integrated in Jenkins build HBase-Trunk_matrix #4717 (See 
[https://builds.apache.org/job/HBase-Trunk_matrix/4717/])
HBASE-19598 Addendum increase sync wait time (zhangduo: rev 
04798d6747ebc9ec91c82df2d9c084922c61da86)
* (edit) 
hbase-server/src/test/java/org/apache/hadoop/hbase/master/TestAssignmentManagerMetrics.java
HBASE-19598 Addendum fix typo (zhangduo: rev 
756cccecffef3a64ae328022ae47fc1d1087dc6c)
* (edit) 
hbase-server/src/test/java/org/apache/hadoop/hbase/master/TestAssignmentManagerMetrics.java


> Fix TestAssignmentManagerMetrics flaky test
> -------------------------------------------
>
>                 Key: HBASE-19598
>                 URL: https://issues.apache.org/jira/browse/HBASE-19598
>             Project: HBase
>          Issue Type: Bug
>          Components: test
>    Affects Versions: 2.0.0-beta-1
>            Reporter: Balazs Meszaros
>            Assignee: stack
>            Priority: Major
>             Fix For: 2.0.0
>
>         Attachments: HBASE-19598-addendum.patch, 
> HBASE-19598.master.001.patch, HBASE-19598.master.002.patch, 
> HBASE-19598.master.003.patch, HBASE-19598.master.003.patch, 
> HBASE-19598.master.004.patch, HBASE-19598.patch, TestUtil.java
>
>
> TestAssignmentManagerMetrics fails constantly. After bisecting, it seems that 
> commit 010012cbcb broke it (HBASE-18946).
> The test method runs successfully, but it cannot shut the minicluster down, 
> and hangs forever.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to