[
https://issues.apache.org/jira/browse/HBASE-21075?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
stack updated HBASE-21075:
--------------------------
Attachment: 0001-HBASE-21075-Confirm-that-we-can-rolling-upgrade-from.patch
> Confirm that we can (rolling) upgrade from 2.0.x and 2.1.x to 2.2.x after
> HBASE-20881
> -------------------------------------------------------------------------------------
>
> Key: HBASE-21075
> URL: https://issues.apache.org/jira/browse/HBASE-21075
> Project: HBase
> Issue Type: Sub-task
> Components: amv2, proc-v2
> Reporter: Duo Zhang
> Assignee: Duo Zhang
> Priority: Blocker
> Fix For: 2.1.1, 2.0.3
>
> Attachments:
> 0001-HBASE-21075-Confirm-that-we-can-rolling-upgrade-from.patch,
> HBASE-21075.patch
>
>
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)