[ 
https://issues.apache.org/jira/browse/HBASE-21075?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

stack updated HBASE-21075:
--------------------------
    Release Note: hbase-2.2.x uses a new Procedure form 
assiging/unassigning/moving Regions; it does not process hbase-2.1.x and 
earlier Unassign/Assign Procedure types. Upgrade requires that we first drain 
the Master Procedure Store of old style Procedures before starting the new 
2.2.x Master. The patch here facilitates the draining process.

> Confirm that we can (rolling) upgrade from 2.0.x and 2.1.x to 2.2.x after 
> HBASE-20881
> -------------------------------------------------------------------------------------
>
>                 Key: HBASE-21075
>                 URL: https://issues.apache.org/jira/browse/HBASE-21075
>             Project: HBase
>          Issue Type: Sub-task
>          Components: amv2, proc-v2
>            Reporter: Duo Zhang
>            Assignee: Duo Zhang
>            Priority: Blocker
>             Fix For: 2.1.1, 2.0.3
>
>         Attachments: 
> 0001-HBASE-21075-Confirm-that-we-can-rolling-upgrade-from.patch, 
> HBASE-21075.patch
>
>




--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to