Duo Zhang commented on HBASE-21787:
-----------------------------------
As said above, if there is a new TRSP, it means that the old one has already
been finished, the only case here is that master crashed before we persist the
finish state. So we attach the new one to the RegionNode, but the lock is still
on the old one, and when the old is executed, it will return immediately and
release the lock, and then the new one can be executed.
So the problem here is that, obviously the old one is not finished, but we
scheduled a new one for the same region, need find out why...
> proc WAL replaces a RIT that holds a lock with a RIT that doesn't
> -----------------------------------------------------------------
>
> Key: HBASE-21787
> URL: https://issues.apache.org/jira/browse/HBASE-21787
> Project: HBase
> Issue Type: Bug
> Affects Versions: 3.0.0
> Reporter: Sergey Shelukhin
> Priority: Critical
>
> This is not the same as HBASE-21786, but related - after master restart, 2
> RITs are both in proc WAL. According to the comment where RIT is restored,
> this is expected.
> However what happens is that master takes lock for the older RIT, and then
> replaces the older RIT with the newer RIT on the region.
> You can see two "to restore RIT" log lines.
> Both RITs are still active in procedures view (and stuck due to yet another
> bug that I will file later). However, it seems wrong that lock is held by one
> RIT but region points to the other RIT as the correct one.
> {noformat}
> 2019-01-25 11:26:54,616 INFO [master/master:17000:becomeActiveMaster]
> procedure.MasterProcedureScheduler: Took xlock for pid=1738, ppid=3,
> state=WAITING:REGION_STATE_TRANSITION_CONFIRM_OPENED, hasLock=false;
> TransitRegionStateProcedure table=table,
> region=27f7ab2a05d9d730b2ab2339d1531b8e, ASSIGN
> 2019-01-25 11:26:54,834 INFO [master/master:17000:becomeActiveMaster]
> assignment.AssignmentManager: Attach pid=1738, ppid=3,
> state=WAITING:REGION_STATE_TRANSITION_CONFIRM_OPENED, hasLock=false;
> TransitRegionStateProcedure table=table,
> region=27f7ab2a05d9d730b2ab2339d1531b8e, ASSIGN to rit=OFFLINE,
> location=null, table=table, region=27f7ab2a05d9d730b2ab2339d1531b8e to
> restore RIT
> 2019-01-25 11:26:54,853 INFO [master/master:17000:becomeActiveMaster]
> assignment.AssignmentManager: Attach pid=4351,
> state=RUNNABLE:REGION_STATE_TRANSITION_GET_ASSIGN_CANDIDATE, hasLock=false;
> TransitRegionStateProcedure table=table,
> region=27f7ab2a05d9d730b2ab2339d1531b8e, ASSIGN to rit=OFFLINE,
> location=null, table=table, region=27f7ab2a05d9d730b2ab2339d1531b8e to
> restore RIT
> 2019-01-25 11:27:02,460 INFO [master/master:17000:becomeActiveMaster]
> assignment.RegionStateStore: Load hbase:meta entry
> region=27f7ab2a05d9d730b2ab2339d1531b8e, regionState=OPENING,
> lastHost=server1,17020,1548290445704,
> regionLocation=server2,17020,1548442571056, openSeqNum=120108
> 2019-01-25 11:27:10,184 INFO [PEWorker-11]
> procedure.MasterProcedureScheduler: Waiting on xlock for pid=4351,
> state=RUNNABLE:REGION_STATE_TRANSITION_GET_ASSIGN_CANDIDATE, hasLock=false;
> TransitRegionStateProcedure table=table,
> region=27f7ab2a05d9d730b2ab2339d1531b8e, ASSIGN held by pid=1738
> {noformat}
--