[
https://issues.apache.org/jira/browse/HBASE-24126?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17077302#comment-17077302
]
Michael Stack commented on HBASE-24126:
---------------------------------------
Pushed an addendum, attached. Also pushed change to personality:
diff --git a/dev-support/hbase-personality.sh b/dev-support/hbase-personality.sh
index 58d2aa8266..be305c5443 100755
--- a/dev-support/hbase-personality.sh
+++ b/dev-support/hbase-personality.sh
@@ -82,7 +82,7 @@ function personality_globals
# Yetus 0.7.0 enforces limits. Default proclimit is 1000.
# Up it. See HBASE-19902 for how we arrived at this number.
#shellcheck disable=SC2034
- PROCLIMIT=10000
+ PROCLIMIT=12500
> Up the container nproc uplimit from 10000 to 12500
> --------------------------------------------------
>
> Key: HBASE-24126
> URL: https://issues.apache.org/jira/browse/HBASE-24126
> Project: HBase
> Issue Type: Sub-task
> Components: build
> Reporter: Michael Stack
> Priority: Major
> Attachments:
> 0001-HBASE-24126-Up-the-container-nproc-uplimit-from-1000.patch
>
>
> Let me up the container nproc count from 10000. If many tests running in
> parallel, container could breach the 10000 limit: i.e. if a bunch of
> heavy-duty long tests run at same time (0.5C on a 16CPU machine means 8
> possible concurrents) and we spin up 1-2000 threads in each test, then could
> hit the 10000 limit. Move up the limit some expecially after INFRA just upped
> our limit to 30000.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)