[ 
https://issues.apache.org/jira/browse/HBASE-24126?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17082610#comment-17082610
 ] 

Michael Stack commented on HBASE-24126:
---------------------------------------

New PR against master that just sets PROC_LIMIT in the personality. See if it 
works (I had wrong variable name in old patches all the ways back to 
HBASE-19902).

> Up the container nproc uplimit from 10000 to 12500
> --------------------------------------------------
>
>                 Key: HBASE-24126
>                 URL: https://issues.apache.org/jira/browse/HBASE-24126
>             Project: HBase
>          Issue Type: Sub-task
>          Components: build
>            Reporter: Michael Stack
>            Priority: Major
>         Attachments: 
> 0001-HBASE-24126-Up-the-container-nproc-uplimit-from-1000.patch
>
>
> Let me up the container nproc count from 10000. If many tests running in 
> parallel, container could breach the 10000 limit: i.e. if a bunch of 
> heavy-duty long tests run at same time (0.5C on a 16CPU machine means 8 
> possible concurrents) and we spin up 1-2000 threads in each test, then could 
> hit the 10000 limit. Move up the limit some expecially after INFRA just upped 
> our limit to 30000. 



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to