[ 
https://issues.apache.org/jira/browse/HIVE-19829?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16507630#comment-16507630
 ] 

Hive QA commented on HIVE-19829:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12927207/HIVE-19829.02.patch

{color:green}SUCCESS:{color} +1 due to 1 test(s) being added or modified.

{color:red}ERROR:{color} -1 due to 2 failed/errored test(s), 14515 tests 
executed
*Failed tests:*
{noformat}
org.apache.hadoop.hive.ql.parse.TestReplicationScenariosAcidTables.testTxnEventNonAcid
 (batchId=233)
org.apache.hadoop.hive.ql.stats.TestStatsUpdaterThread.testQueueingWithThreads 
(batchId=276)
{noformat}

Test results: 
https://builds.apache.org/job/PreCommit-HIVE-Build/11695/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/11695/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-11695/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 2 tests failed
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12927207 - PreCommit-HIVE-Build

> Incremental replication load should create tasks in execution phase rather 
> than semantic phase
> ----------------------------------------------------------------------------------------------
>
>                 Key: HIVE-19829
>                 URL: https://issues.apache.org/jira/browse/HIVE-19829
>             Project: Hive
>          Issue Type: Task
>          Components: repl
>    Affects Versions: 3.1.0, 4.0.0
>            Reporter: mahesh kumar behera
>            Assignee: mahesh kumar behera
>            Priority: Major
>              Labels: pull-request-available
>             Fix For: 3.1.0, 4.0.0
>
>         Attachments: HIVE-19829.01.patch, HIVE-19829.02.patch
>
>
> Split the incremental load into multiple iterations. In each iteration create 
> number of tasks equal to the configured value.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to