[
https://issues.apache.org/jira/browse/HIVE-19829?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16515135#comment-16515135
]
Hive QA commented on HIVE-19829:
--------------------------------
Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12927968/HIVE-19829.06.patch
{color:green}SUCCESS:{color} +1 due to 4 test(s) being added or modified.
{color:green}SUCCESS:{color} +1 due to 14541 tests passed
Test results:
https://builds.apache.org/job/PreCommit-HIVE-Build/11858/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/11858/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-11858/
Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
{noformat}
This message is automatically generated.
ATTACHMENT ID: 12927968 - PreCommit-HIVE-Build
> Incremental replication load should create tasks in execution phase rather
> than semantic phase
> ----------------------------------------------------------------------------------------------
>
> Key: HIVE-19829
> URL: https://issues.apache.org/jira/browse/HIVE-19829
> Project: Hive
> Issue Type: Task
> Components: repl
> Affects Versions: 3.1.0, 4.0.0
> Reporter: mahesh kumar behera
> Assignee: mahesh kumar behera
> Priority: Major
> Labels: pull-request-available
> Fix For: 3.1.0, 4.0.0
>
> Attachments: HIVE-19829.01.patch, HIVE-19829.02.patch,
> HIVE-19829.03.patch, HIVE-19829.04.patch, HIVE-19829.06.patch
>
>
> Split the incremental load into multiple iterations. In each iteration create
> number of tasks equal to the configured value.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)