[
https://issues.apache.org/jira/browse/HIVE-23204?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Miklos Gergely updated HIVE-23204:
----------------------------------
Description:
If the ptest configuration is required to be modified, then the server must be
restarted, which causes the actually processed patch to fail. In order not to
cause trouble to others, the pair of this dummy Jira can be used by queueing
this first, then the actual modification, finally this Jira.
When the patch for the other one
([https://issues.apache.org/jira/browse/HIVE-23203]) is is processed, the ptest
configuration can be modified, and the server can be restarted, thus the other
dummy jira's patch processing will fail. Then the actual modification comes,
which will result in some way or the other. Then this dummy Jira comes, and the
ptest modifications can be reverted, and the server can be restarted again.
was:
If the ptest configuration is required to be modified, then the server must be
restarted, which causes the actually processed patch to fail. In order not to
cause trouble to others, this dummy Jira can be used by queueing this first,
then the actual modification, finally the pair of this Jira.
When the patch for this one is is processed, the ptest configuration can be
modified, and the server can be restarted, thus this dummy jira's patch
processing will fail. Then the actual modification comes, which will result in
some way or the other. Then the other dummy Jira comes, and the ptest
modifications can be reverted, and the server can be restarted again.
> Dummy jira for modifying ptest configuration - after the actual patch
> ---------------------------------------------------------------------
>
> Key: HIVE-23204
> URL: https://issues.apache.org/jira/browse/HIVE-23204
> Project: Hive
> Issue Type: Test
> Components: Hive
> Reporter: Miklos Gergely
> Priority: Major
>
> If the ptest configuration is required to be modified, then the server must
> be restarted, which causes the actually processed patch to fail. In order not
> to cause trouble to others, the pair of this dummy Jira can be used by
> queueing this first, then the actual modification, finally this Jira.
> When the patch for the other one
> ([https://issues.apache.org/jira/browse/HIVE-23203]) is is processed, the
> ptest configuration can be modified, and the server can be restarted, thus
> the other dummy jira's patch processing will fail. Then the actual
> modification comes, which will result in some way or the other. Then this
> dummy Jira comes, and the ptest modifications can be reverted, and the server
> can be restarted again.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)