[ 
https://issues.apache.org/jira/browse/HIVE-15051?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16012540#comment-16012540
 ] 

Hive QA commented on HIVE-15051:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12868317/HIVE-15051.patch

{color:red}ERROR:{color} -1 due to no test(s) being added or modified.

{color:red}ERROR:{color} -1 due to 4 failed/errored test(s), 10717 tests 
executed
*Failed tests:*
{noformat}
org.apache.hadoop.hive.cli.TestMiniLlapCliDriver.testCliDriver[table_nonprintable]
 (batchId=140)
org.apache.hadoop.hive.cli.TestMiniLlapLocalCliDriver.testCliDriver[vector_if_expr]
 (batchId=144)
org.apache.hadoop.hive.cli.TestMiniTezCliDriver.testCliDriver[explainanalyze_3] 
(batchId=97)
org.apache.hadoop.hive.cli.TestMiniTezCliDriver.testCliDriver[explainuser_3] 
(batchId=97)
{noformat}

Test results: https://builds.apache.org/job/PreCommit-HIVE-Build/5282/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/5282/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-5282/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 4 tests failed
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12868317 - PreCommit-HIVE-Build

> Test framework integration with findbugs, rat checks etc.
> ---------------------------------------------------------
>
>                 Key: HIVE-15051
>                 URL: https://issues.apache.org/jira/browse/HIVE-15051
>             Project: Hive
>          Issue Type: Sub-task
>          Components: Testing Infrastructure
>            Reporter: Peter Vary
>            Assignee: Peter Vary
>         Attachments: beeline.out, HIVE-15051.patch, Interim.patch, ql.out
>
>
> Find a way to integrate code analysis tools like findbugs, rat checks to 
> PreCommit tests, thus removing the burden from reviewers to check the code 
> style and other checks which could be done by code. 
> Might worth to take a look on Yetus, but keep in mind the Hive has a specific 
> parallel test framework.



--
This message was sent by Atlassian JIRA
(v6.3.15#6346)

Reply via email to