[
http://jira.codehaus.org/browse/MNG-3566?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=133548#action_133548
]
Benjamin Bentmann commented on MNG-3566:
----------------------------------------
bq. This is not available for M209
Are you aware of the description for this phase, which says:
bq. perform any operations necessary to prepare a package before the actual
packaging. This often results in an unpacked, processed version of the package.
(*Maven 2.1 and above*)
> Phase prepare-package not available
> -----------------------------------
>
> Key: MNG-3566
> URL: http://jira.codehaus.org/browse/MNG-3566
> Project: Maven 2
> Issue Type: Bug
> Components: Plugins and Lifecycle
> Affects Versions: 2.0.9
> Reporter: Joerg Schaible
>
> The default lifecycle contains a phase prepare-package (according to
> http://maven.apache.org/guides/introduction/introduction-to-the-lifecycle.html).
> This is not available for M209, the component.xml in maven-core misses this
> phase for the 2.0.x series.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
http://jira.codehaus.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira