[
https://issues.apache.org/jira/browse/METRON-1724?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16591249#comment-16591249
]
ASF GitHub Bot commented on METRON-1724:
----------------------------------------
Github user ruffle1986 commented on the issue:
https://github.com/apache/metron/pull/1172
I think the problem is that we use the same validator function for both the
start and the end date.
So after putting it into an invalid state (step 2), however you add a valid
time to the start date, the validator function will complain because the end
time is still in an invalid state. That's why the start time is still marked in
red.
> Date/time validation missing in PCAP query
> ------------------------------------------
>
> Key: METRON-1724
> URL: https://issues.apache.org/jira/browse/METRON-1724
> Project: Metron
> Issue Type: Bug
> Reporter: Tibor Meller
> Priority: Major
>
> Validation formula should be the following:
> From < To < current date/time
>
> Validation messages:
> Selected date range is invalid. The "To" date must be later than the "From"
> date and the "To" date cannot be in the future.
> Source IP address format is invalid. Use valid v4IP format, for example,
> [192.168.0.1|http://192.168.0.1/].
> Source port is invalid. Port number must be within the range of 0-65535.
> Destination IP address format is invalid. Use valid v4IP format, for example,
> [192.168.0.1|http://192.168.0.1/].
> Destination port is invalid. Port number must be within the range of 0-65535.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)