https://bz.apache.org/ooo/show_bug.cgi?id=126166

          Issue ID: 126166
        Issue Type: DEFECT
           Summary: date entry  fraction
           Product: Base
           Version: 4.1.0
          Hardware: PC
                OS: Windows 7
            Status: UNCONFIRMED
          Severity: minor
          Priority: P5
         Component: code
          Assignee: [email protected]
          Reporter: [email protected]

When entering a field expecting a date on certain days the combination of month
and day is automatically turned into a fraction.  It can be worked around, but
is annoying.  For instance, if I am entering a date of March 4th, and I enter
3/4 it will turn it automatically into the ¾ fraction.  If I enter 3/4/2015 it
turns it into ¾/2015.  Of course I can enter 03/04/2015 and it will enter
correctly.  Since I do not have to usually worry about this when entering dates
in this field, it almost always catches me when it happens.

-- 
You are receiving this mail because:
You are the assignee for the issue.

Reply via email to