https://bz.apache.org/ooo/show_bug.cgi?id=126166
Issue ID: 126166
Issue Type: DEFECT
Summary: date entry fraction
Product: Base
Version: 4.1.0
Hardware: PC
OS: Windows 7
Status: UNCONFIRMED
Severity: minor
Priority: P5
Component: code
Assignee: [email protected]
Reporter: [email protected]
When entering a field expecting a date on certain days the combination of month
and day is automatically turned into a fraction. It can be worked around, but
is annoying. For instance, if I am entering a date of March 4th, and I enter
3/4 it will turn it automatically into the ¾ fraction. If I enter 3/4/2015 it
turns it into ¾/2015. Of course I can enter 03/04/2015 and it will enter
correctly. Since I do not have to usually worry about this when entering dates
in this field, it almost always catches me when it happens.
--
You are receiving this mail because:
You are the assignee for the issue.