[ 
https://issues.apache.org/jira/browse/PHOENIX-5268?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17024941#comment-17024941
 ] 

Hadoop QA commented on PHOENIX-5268:
------------------------------------

{color:red}-1 overall{color}.  Here are the results of testing the latest 
attachment 
  
http://issues.apache.org/jira/secure/attachment/12991986/PHOENIX-5268.master.v1.patch
  against master branch at commit 41a24eb35244799bdd2f49ba157f29b40b3564e4.
  ATTACHMENT ID: 12991986

    {color:green}+1 @author{color}.  The patch does not contain any @author 
tags.

    {color:green}+1 tests included{color}.  The patch appears to include 29 new 
or modified tests.

    {color:red}-1 patch{color}.  The patch command could not apply the patch.

Console output: 
https://builds.apache.org/job/PreCommit-PHOENIX-Build/3352//console

This message is automatically generated.

> HBase 2.1/2.2 compatibility
> ---------------------------
>
>                 Key: PHOENIX-5268
>                 URL: https://issues.apache.org/jira/browse/PHOENIX-5268
>             Project: Phoenix
>          Issue Type: Bug
>            Reporter: Josh Elser
>            Assignee: Istvan Toth
>            Priority: Blocker
>             Fix For: 5.1.0
>
>         Attachments: PHOENIX-5268.master.v1.patch
>
>          Time Spent: 3h
>  Remaining Estimate: 0h
>
> HBASE-21754 introduces a new abstract method to RpcScheduler: 
> {{getMetaPriorityQueueLength()}}
> This means that Phoenix does not build against HBase 2.0.5.
> FYI [[email protected]], [~Jaanai].



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to