Hi,

Below are the parameters and the Calling method

    CAL.TYPE =""
    SSTRAT.DATE = TODAY
    SIGN ="+"
    DISPLACEMENT ="0W"
    FOR.BACK.IND ="F"
    COUNTRY.CODE = "PK10010001"
    REGION.CD="00"
    RETURN.DATE =""
    RETURN.CODE =""
    RETURN.DISPLACAMENT =""

    CALL
WORKING.DAY(CAL.TYPE,SSTRAT.DATE,SIGN,DISPLACEMENT,FOR.BACK.IND,COUNTRY.CODE,
REGION.CD,RETURN.DATE,RETURN.CODE,RETURN.DISPLACAMENT)

and u can check the output in RETURN.DISPLACAMENT parameter

Regards,
Muhammad Arif Rana

On Sat, Jul 30, 2011 at 12:05 AM, AMOS A.ODEBIYI <[email protected]>wrote:

> Dear all,Does anyone has  info on the above subroutine ( i.e WORKING.DAY
> subroutine) and all the required parameters ?A manual or link on this will
> be highly welcome too.Thanks in advance.Cheers.SOJ
>
> --
> Please read the posting guidelines at:
> http://groups.google.com/group/jBASE/web/Posting%20Guidelines
>
> IMPORTANT: Type T24: at the start of the subject line for questions
> specific to Globus/T24
>
> To post, send email to [email protected]
> To unsubscribe, send email to [email protected]
> For more options, visit this group at
> http://groups.google.com/group/jBASE?hl=en
>

-- 
Please read the posting guidelines at: 
http://groups.google.com/group/jBASE/web/Posting%20Guidelines

IMPORTANT: Type T24: at the start of the subject line for questions specific to 
Globus/T24

To post, send email to [email protected]
To unsubscribe, send email to [email protected]
For more options, visit this group at http://groups.google.com/group/jBASE?hl=en

Reply via email to