I'm new to BPM and I'm starting to evaluate the jBPM (jbpm-jpdl-suite-3.2.2.zip). Which are the steps to use the "Configure task" check box? When I check this box appear some tabs (General, Details, Assignment, Controller, Reminder). If I want define some input fields I must use Details--->Generate Form or Controller--->Choose--->Default....??? thanks.
View the original post : http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4113702#4113702 Reply to the post : http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&p=4113702 _______________________________________________ jboss-user mailing list [email protected] https://lists.jboss.org/mailman/listinfo/jboss-user
