On 02/12/2019 11.55, Daniel Beck wrote:
Hi everyone,
2.204.1 is scheduled for Dec 18, .2 would be released on Jan 15, with the RC
scheduled for on Jan 1.
I don't expect a lot of backport candidates, or feedback on .1 in general, to
come in between Dec 18 and Jan 1.
Hence I propose we take a two week break as in past years, postponing the RC
and release of .2 (and all subsequent releases) by two weeks, so that the new
dates are:
- Dec 18: .1 release (unchanged)
- Jan 15: .2 RC
- Jan 29: .2 release
- Feb 12: .3 RC
etc.
Thoughts?
Daniel
--