So, we're trying to measure the capabilities of a load balanced environment;
I need to generate a long term test plan (at least 24 hour cycle running for
several days). The plan should emulate a daily load on a pair of enterprise
sites; varying from low to high to low over time.

I've figured out much of what I need, except for the varying load over time.
Structures like this:

Test Plan:
Thread Group (10)
Thread Group (30)
Thread Group (50)
Thread Group (20)
Thread Group (10)

Seem to launch all threads at once. I attempted to use the scheduler
feature, but it's not well documented: can you use relative times? Are times
in AM/PM or 24 hour format? Apparently I'm not guessing well, because
attempts to use the scheduler just end up with none of the threads running
at all.

Any help or suggestions would be appreciated!



------------------------------------------------------------------------------
Notice:  This e-mail message, together with any attachments, contains
information of Merck & Co., Inc. (One Merck Drive, Whitehouse Station, New
Jersey, USA 08889), and/or its affiliates (which may be known outside the
United States as Merck Frosst, Merck Sharp & Dohme or MSD and in Japan as
Banyu) that may be confidential, proprietary copyrighted and/or legally
privileged. It is intended solely for the use of the individual or entity
named on this message.  If you are not the intended recipient, and have
received this message in error, please notify us immediately by reply e-mail
and then delete it from your system.
------------------------------------------------------------------------------

---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]

Reply via email to