The Test Plan has a check-box entitled: 

Run each Thread Group separately

This should make the Thread Groups run in sequence.

Have you tried this?
S.
----- Original Message ----- 
From: "Michael Heinz" <[EMAIL PROTECTED]>
To: <[EMAIL PROTECTED]>
Sent: Friday, February 06, 2004 7:41 PM
Subject: Getting started with Jmeter, having trouble with the scheduler


So, we're trying to measure the capabilities of a load balanced environment;
I need to generate a long term test plan (at least 24 hour cycle running for
several days). The plan should emulate a daily load on a pair of enterprise
sites; varying from low to high to low over time.

I've figured out much of what I need, except for the varying load over time.
Structures like this:

Test Plan:
Thread Group (10)
Thread Group (30)
Thread Group (50)
Thread Group (20)
Thread Group (10)

Seem to launch all threads at once. I attempted to use the scheduler
feature, but it's not well documented: can you use relative times? Are times
in AM/PM or 24 hour format? Apparently I'm not guessing well, because
attempts to use the scheduler just end up with none of the threads running
at all.




---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]

Reply via email to