The Test Plan has a check-box entitled: Run each Thread Group separately
This should make the Thread Groups run in sequence. Have you tried this? S. ----- Original Message ----- From: "Michael Heinz" <[EMAIL PROTECTED]> To: <[EMAIL PROTECTED]> Sent: Friday, February 06, 2004 7:41 PM Subject: Getting started with Jmeter, having trouble with the scheduler So, we're trying to measure the capabilities of a load balanced environment; I need to generate a long term test plan (at least 24 hour cycle running for several days). The plan should emulate a daily load on a pair of enterprise sites; varying from low to high to low over time. I've figured out much of what I need, except for the varying load over time. Structures like this: Test Plan: Thread Group (10) Thread Group (30) Thread Group (50) Thread Group (20) Thread Group (10) Seem to launch all threads at once. I attempted to use the scheduler feature, but it's not well documented: can you use relative times? Are times in AM/PM or 24 hour format? Apparently I'm not guessing well, because attempts to use the scheduler just end up with none of the threads running at all. --------------------------------------------------------------------- To unsubscribe, e-mail: [EMAIL PROTECTED] For additional commands, e-mail: [EMAIL PROTECTED]

