For the L2Switch release review Monday morning, I have the following analysis of their upstream CSIT for boron, using the most recent boron job result.
please note that I do not know if all delivered features have system test or not, so only reporting on what exists. NOT-OK l2switch-csit-1node-switch-all-boron (unexpected failures) NOT-OK l2switch-csit-1node-switch-only-boron (unexpected failures) NOT-OK l2switch-csit-1node-periodic-host-scalability-daily-only-boron (scale result is 0) OK l2switch-csit-1node-scalability-all-boron OK l2switch-csit-1node-scalability-only-boron With these results, I would say that *L2Switch only has experimental features* at this point. Thanks, JamO _______________________________________________ L2switch-dev mailing list L2switch-dev@lists.opendaylight.org https://lists.opendaylight.org/mailman/listinfo/l2switch-dev