After discussion with Henry and Jim, we came up with this plan for releasing PR1 out of subversion. Everybody please READ CAREFULLY and look for problems. I've only been a buildmeister for **checks watch** a few weeks.
* Henry merges any changes from lps-dev into lps-legals. There should not be many of these since the last time he did it, because lps-dev is now LOCKED and effectively dead. * Everybody gets all of their changes in to lps-legals and please stable by Friday morning... so that... * I take a snapshot of lps-legals and create from it http:// svn.openlaszlo.org/openlaszlo/branches/legals * Friday/Saturday/Sunday, I merge all the changes I've ever made to openlaszlo/trunk into openlaszlo/legals; this includes the toolsmigration branch and the work of the last week or so to automate the builds. * I make lps-legals build after all of that merging... by MONDAY * Any more changes to lps-legals after my snapshot will have to be merged by hand into openlaszlo/branches/legals. * Sunday night (I hope) I spin an svn build of branches/legals which is hopefully a release candidate, inasmuch as we don't really have an official release for PR1, do we? * Monday, we examine, poke at, play with etc openlaszlo/branches/legals * Tuesday, we release. benjamin shine software engineer [EMAIL PROTECTED] _______________________________________________ Laszlo-dev mailing list [email protected] http://www.openlaszlo.org/mailman/listinfo/laszlo-dev
