In message <[EMAIL PROTECTED]>, Rob Seaman writes:
>III) Locale
> A) restrict focus to Earth
> B) Solar system-wide solution
C) Universe-wide solution.
I'm not sure if there is a difference between the two, but for completeness
sake.
> F) Scheduling
> 1) as needed
> 2) fixed in advance
I would have thought this would be:
1) correction issued as table
2) correction issued as formula
> G) Optimization
> 1) remain within tolerance (e.g., 0.9s)
> 2) minimize figure of merit (e.g., DUT1)
3) maximize scheduling horizon.
--
Poul-Henning Kamp | UNIX since Zilog Zeus 3.20
[EMAIL PROTECTED] | TCP/IP since RFC 956
FreeBSD committer | BSD since 4.3-tahoe
Never attribute to malice what can adequately be explained by incompetence.