In message <[EMAIL PROTECTED]>, Rob Seaman writes:

>III) Locale
>     A) restrict focus to Earth
>     B) Solar system-wide solution

      C) Universe-wide solution.

I'm not sure if there is a difference between the two, but for completeness 
sake.

>     F) Scheduling
>         1) as needed
>         2) fixed in advance

I would have thought this would be:

          1) correction issued as table
          2) correction issued as formula

>     G) Optimization
>         1) remain within tolerance (e.g., 0.9s)
>         2) minimize figure of merit (e.g., DUT1)

          3) maximize scheduling horizon.

--
Poul-Henning Kamp       | UNIX since Zilog Zeus 3.20
[EMAIL PROTECTED]         | TCP/IP since RFC 956
FreeBSD committer       | BSD since 4.3-tahoe
Never attribute to malice what can adequately be explained by incompetence.

Reply via email to