The recent discussions about gnx clashes must proceed at their own pace and 
must be fully resolved before ramping up for a1.

Any new gnx code must be thoroughly tested before a1 goes out the door.

I was thinking that a1 might go out the door this Friday, but next Friday 
looks more likely now.

This delay bothers me not at all.  There are several bugs that can be fixed 
in the meantime, and a lot of work on documentation that must be done 
before a1.

Edward

-- 
You received this message because you are subscribed to the Google Groups 
"leo-editor" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/leo-editor.
For more options, visit https://groups.google.com/d/optout.

Reply via email to