https://bugs.freedesktop.org/show_bug.cgi?id=57865

          Priority: medium
            Bug ID: 57865
          Assignee: [email protected]
           Summary: Calc Function DATE doesn't calculate correctly
          Severity: normal
    Classification: Unclassified
                OS: All
          Reporter: [email protected]
          Hardware: All
            Status: UNCONFIRMED
           Version: 3.6.1.2 release
         Component: Spreadsheet
           Product: LibreOffice

Created attachment 70985
  --> https://bugs.freedesktop.org/attachment.cgi?id=70985&action=edit
The attached spreadsheet describes the problem

How to replicate:

A1 =DATE(2012,6,25)
A2 =DATE(2012,MONTH(A1)+1,25)
Use the handle on A2 and go right down to say, A25

A8 =DATE(2012,MONTH(A7)+1,25) (25/01/13) which correct, BUT
A9 =DATE(2012,MONTH(A8)+1,25) (25/02/12) which is WRONG
A9 should be (25/02/13) not (25/02/12)!

-- 
You are receiving this mail because:
You are the assignee for the bug.
_______________________________________________
Libreoffice-bugs mailing list
[email protected]
http://lists.freedesktop.org/mailman/listinfo/libreoffice-bugs

Reply via email to