[EMAIL PROTECTED] writes:
> Now I have the first version of the beaming patch.
> My idea is to split the beamed section at the middle of duration if this
> was possible.

I disagree with this. The split points are determined by the
meter. What if you have 9 16ths (triplet) in  3/8?

> +  /* YIKES!!! FIXME!!! SLAM!!! There must be a simpler and cleaner way to get

You should add a duration field to Beaming_info

-- 

Han-Wen Nienhuys   |   [EMAIL PROTECTED]    | http://www.cs.uu.nl/~hanwen/


_______________________________________________
Lilypond-devel mailing list
[EMAIL PROTECTED]
http://mail.gnu.org/mailman/listinfo/lilypond-devel

Reply via email to