[EMAIL PROTECTED] writes:
> Now I have the first version of the beaming patch.
> My idea is to split the beamed section at the middle of duration if this
> was possible.
I disagree with this. The split points are determined by the
meter. What if you have 9 16ths (triplet) in 3/8?
> + /* YIKES!!! FIXME!!! SLAM!!! There must be a simpler and cleaner way to get
You should add a duration field to Beaming_info
--
Han-Wen Nienhuys | [EMAIL PROTECTED] | http://www.cs.uu.nl/~hanwen/
_______________________________________________
Lilypond-devel mailing list
[EMAIL PROTECTED]
http://mail.gnu.org/mailman/listinfo/lilypond-devel