Den 22-Sep-01 skrev Han-Wen Nienhuys:
HN>> Now I have the first version of the beaming patch.
HN>> My idea is to split the beamed section at the middle of duration if this
HN>> was possible.
HN>
HN> I disagree with this. The split points are determined by the
HN> meter. What if you have 9 16ths (triplet) in 3/8?
Then it will not be possible to split at the middle - and the old routine
takes over. But ofcourse, if one has 8 16ths (triplet) in 3/8 then the
routine would behave strangely. And perhaps also with 6 16ths (non-triplet)
in 3/8.
HN> You should add a duration field to Beaming_info
I'll have a look
-Rune
_______________________________________________
Lilypond-devel mailing list
[EMAIL PROTECTED]
http://mail.gnu.org/mailman/listinfo/lilypond-devel