"Raghavendra B K (RBIN/TDB)" proclaimed:
> Provided all the resources are in place (no UPS maintenance required), what
> is the maximum duration in days the Linux box will be up? If so, what are
> the constraints?
The machine on which this mailing list runs has had uptimes upto 130+ days
(Damn power outage forced the machine to be rebooted). See
http://lists.linux-india.org/archive/linux-india-general/200004/msg00033.html
Thaths
--
Bill: Doctors say life expectancy of the average man is now seventy six
point two years.
Homer: Seventy six point two? But I'm already thirty eight point one!
I've wasted half my life.
Sudhakar C13n http://www.aunet.org/thaths/ Lead Indentured Slave
-----------------------------------------------------------------------
For information on this and other Linux India mailing lists check out
http://lists.linux-india.org/