Been a while since I posted. I’m wondering if anyone knows the truth behind summarization schedules for application deployments. I have many deployments to create in a short period of time and would like to avoid them all summarizing at the same times.
Dialog box shows this: The paragraph at the top says “The period of time is calculated based on the deployment start time” but the settings say “Frequency of status updates for a deployment that was modified in the last x days” SO which is it? Is it based on the deployment start time or the last modified time? I’d like to think I can create the several hundred deployments with a deployment start time older than 90 days and avoid having them summarize every 60 minutes. Does anyone know which value the summarization schedule is based on? If it is the last modified time, I’ll have to be a bit more cautious about how many and when I create these deployments. Thanks, -Nick-
