The weekly Data Management Project Manager's Online Meeting will be
conducted on Friday, September 1, at the usual time and place (10:00am
PDT/PST, dial-in is 866 330 1200 passcode 300 2363, video is the NOAO bridge
at IP 140.252.1.34).

Agenda
Inter-group Topics (Telescope and Site, Camera, System Engineering)


MREFC Proposal Volume I -
Draft slideset/storyboard (#2082) posted Wednesday with writing assignments
in Notes.  We need first draft to Jeff by September 11.
Remaining items:
1. Revised Archive Center Infrastructure Acquisition Plan for Operations (is
1 5-year refresh the most cost-effective?) - Cristina Beldica, Chris Cribbs,
Michelle Butler
2. Revised CPU for Queries - Tim, Jacek
3. Justification for 2-year doubling of CPU - Michelle Butler, Don Dossa
4. Reliability/single point of failure analysis - Don Dossa
5. Discussion of NVO portal relevance to LSST - Chris Smith
6. System Integration Diagram/text - Jeff

DC1 - 
Progress check on Stage 3 readiness/execution.

LSST R&D Plan/FY07 Budget -
In work, we will be contacting people for updated statements of work after
9/15.

Upcoming Meetings/Workshops 2006 -
See document-2282

_______________________________________________
LSST-data mailing list
[email protected]
http://www.lsstmail.org/mailman/listinfo/lsst-data

Reply via email to