The weekly Data Management Project Manager's Online Meeting will be conducted on Friday, September 1, at the usual time and place (10:00am PDT/PST, dial-in is 866 330 1200 passcode 300 2363, video is the NOAO bridge at IP 140.252.1.34).
Agenda Inter-group Topics (Telescope and Site, Camera, System Engineering) MREFC Proposal Volume I - Draft slideset/storyboard (#2082) posted Wednesday with writing assignments in Notes. We need first draft to Jeff by September 11. Remaining items: 1. Revised Archive Center Infrastructure Acquisition Plan for Operations (is 1 5-year refresh the most cost-effective?) - Cristina Beldica, Chris Cribbs, Michelle Butler 2. Revised CPU for Queries - Tim, Jacek 3. Justification for 2-year doubling of CPU - Michelle Butler, Don Dossa 4. Reliability/single point of failure analysis - Don Dossa 5. Discussion of NVO portal relevance to LSST - Chris Smith 6. System Integration Diagram/text - Jeff DC1 - Progress check on Stage 3 readiness/execution. LSST R&D Plan/FY07 Budget - In work, we will be contacting people for updated statements of work after 9/15. Upcoming Meetings/Workshops 2006 - See document-2282 _______________________________________________ LSST-data mailing list [email protected] http://www.lsstmail.org/mailman/listinfo/lsst-data
