Hi, a small question regarding branch values,

I have the following data:

   R (% on 100 MVA)       X (% on 100 MVA)      B (% on 100 MVA)
  0.0502                0.653                64.361                     

These values are taking from a national network data sheet, they are in %pu so
presumably they need to be divided by 100.  But after that can they be input
into MATPOWER straight away or is there any other calculation needed.   Sorry if
this seems a very basic question!

thanks for your help.

shane

Reply via email to