Hi, a small question regarding branch values, I have the following data:
R (% on 100 MVA) X (% on 100 MVA) B (% on 100 MVA) 0.0502 0.653 64.361 These values are taking from a national network data sheet, they are in %pu so presumably they need to be divided by 100. But after that can they be input into MATPOWER straight away or is there any other calculation needed. Sorry if this seems a very basic question! thanks for your help. shane
