Dear Professor Zimmerman,

 

I think that there is a probable mistake in the auction method
(smartmarket), specifically in DC OPF. I run a smartmarket and OPF (DC and
AC) without fixed load, i.e., the two nodes system only has  generators
offers and demand bids (inelastic).

 

When, I run AC OPF the results are correct, but with DC OPF the results may
be wrong, because the inyections and extractions electricity are very
different to the AC responses:

 

Node              DC OPF                            DC OPF

                Pot          Lambda                Pot          Lambda

                MW           $/MW                   MW         $/MW

1           70.8298      15                   60.0394     15.00

2         -70.8298       15                  -60.0067     15.016

 

I think the correct responses for DC OPF is 60 MW in the two nodes. Why are
the AC and DC results so different? 

 

When, the capacity line decreases to 50 MW, the inyections and extractions
electricity are correct, but the prices changes:

 

Node              DC OPF                            DC OPF

                Pot          Lambda                Pot          Lambda

                MW           $/MW                   MW         $/MW

1                50        11.32                   49.99        10

2               -50        18.00                  -49.97       18

 

I think the correct responses for DC OPF is 10 and 18 ($/MW). Why are the
prices (AC and DC) in the node 1 so different? 

 

Please, explain me What is my mistake? or Where can I modify the mistake?.
Because I need the model for my investigation.  

 

Thank

 

 

 

function mpc = subasta
%% MATPOWER Case Format : Version 2
mpc.version = '2';

%% system MVA base
mpc.baseMVA = 100;

%% bus data
%       bus_i   type    Pd      Qd      Gs      Bs      area    Vm      Va      
baseKV  zone    Vmax    Vmin
mpc.bus = [
        1       3       0       0       0       0       1       1       0       
135     1       1.05    0.95;
        2       2       0       0       0       0       1       1       0       
135     1       1.05    0.95;
];

%% generator data
%       bus     Pg      Qg      Qmax    Qmin    Vg      mBase   status  Pmax    
Pmin
mpc.gen = [
        1       30      0       60      -15     1       100     1       100     
0;
        2       -30     0       0       0       1       100     1       0       
-90;
];

%% branch data
%       fbus    tbus    r       x       b       rateA   rateB   rateC   ratio   
angle   status
mpc.branch = [
        1       2       0.001   0.01    0.0     150     150     150     0       
0       1;
];

%%-----  OPF Data  -----%%
%% generator cost data
%       1       startup shutdown        n       x1      y1      ...     xn      
yn
%       2       startup shutdown        n       c(n-1)  ...     c0
mpc.gencost = [
        1       0       0       4       0       0       25      125     50      
375     100     1125;
        1       0       0       4       -90     -1590   -60     -1140   -30     
-600    0       0;
    ];

%offers.P.qty = [ 25 25 50];
%offers.P.prc = [ 5 10 15];
%bids.P.qty = [ 30 30 30 ];
%bids.P.prc = [ 20 18 15];