Hello,

I've been working on IEEE 123 nodes system and created a model for MatPower
power flow. This model is basically a radial distribution system with a
single generation at substation and works fine when I can use runpf(), and
it returns similar result as shown IEEE 123 node system report. However,
when I use the same model for runopf(), it shows


Numerically Failed
Did not converge in 4 iterations.
Did not converge (0.10 seconds)

The total generation is very different from total demand, and bus voltages
are at strange values (e.g. 1.836p.u. at reference bus). Also, generation
cost Lambda are extremely high (e.g. 17528752586.76 $/MWh @ bus 6). I have
tried to add multiple DGs at different locations and change the system to a
ring type system, but it didn't work out. Does anyone have any suggestions
or experiences to this problem? Your help is highly appreciated!

Have a good day!*

Fanjun Meng
*

Reply via email to