Dear Dr. Ray Zimmerman


Currently my aim is to use SVC to enhance power system security in terms of 
reducing branches overloading and bus voltage voilation in case contingency 
arise such as tripping of line or generator, later I want to find optimal 
location for SVC to enhance power security, so is this modeling is suitable.



Best Regards



Omer Ali



________________________________
From: [email protected] 
[[email protected]] on behalf of Ray Zimmerman 
[[email protected]]
Sent: 09 May 2013 22:58
To: MATPOWER discussion forum
Subject: Re: CLARIFICATION

It depends how you want to operate the SVC. If you want to solve a power flow 
with the SVC set to maintain a set point voltage, this should be fine.

--
Ray Zimmerman
Senior Research Associate
419A Warren Hall, Cornell University, Ithaca, NY 14853
phone: (607) 255-9645




On May 9, 2013, at 2:29 AM, Umer Ali Alsedeeq Ibrahim 
<[email protected]<mailto:[email protected]>> wrote:

Dear  Dr. Ray Zimmerman

If I want to place SVC with rating (±100MVAR) at load bus ( BUS TYPE 1)  for 
example at  bus#4 in the below example, the load bus shall be change to (BUS 
TYPE 2 )  and in the generator data, I have to add the load bus to generator 
bus with  Pmax=Pmin =0  , Qmax =100, Qmin =-100MVAR




%% bus data
%   bus_i   type    Pd  Qd  Gs  Bs  area    Vm  Va  baseKV  zone    Vmax    Vmin
mpc.bus = [
    1   3   0   0   0   0   1   1.05    0   230 1   1.05    1.05;
    2   2   0   0   0   0   1   1.05    0   230 1   1.05    1.05;
    3   2   0   0   0   0   1   1.07    0   230 1   1.07    1.07;
    4   2   70  70  0   0   1   1   0   230 1   1.05    0.95; ( I have change 
the bus from 1 to 2)
    5   1   70  70  0   0   1   1   0   230 1   1.05    0.95;
    6   1   70  70  0   0   1   1   0   230 1   1.05    0.95;
];


%% generator data
%   bus Pg  Qg  Qmax    Qmin    Vg  mBase   status  Pmax    Pmin    Pc1 Pc2 
Qc1min  Qc1max  Qc2min  Qc2max  ramp_agc    ramp_10 ramp_30 ramp_q  apf
mpc.gen = [
    1   0   0   100 -100    1.05    100 1   200 50  0   0   0   0   0   0   0   
0   0   0   0;
    2   50  0   100 -100    1.05    100 1   150 37.5    0   0   0   0   0   0   
0   0   0   0   0;
    3   60  0   100 -100    1.07    100 1   180 45  0   0   0   0   0   0   0   
0   0   0   0;
   4    0   0  100 -100   1.05    100 1    0   0  0   0   0   0   0   0   0   0 
  0   0   0 ( I have put Pmax=Pmin=0
];

I have modify the case6ww data to incorporate SVC at Bus #4 as shown in bus and 
generator data, please let me know whether I am in right track or not, please 
help

Best Regards

Omer Ali Elsiddig Ibrahim
[Logo]

Disclaimer:

This e-mail and any attachments may contain information which is confidential. 
They should not be distributed, disclosed or copied to anyone without the 
approval of the sender. If you are not one of the intended recipients of this 
e-mail, please delete the e-mail and any attachments, and all copies, and 
notify the sender by e-mail or telephone. Confidentiality is not waived or lost 
by mistaken communication. Before opening this e-mail or an attachment, you 
should check them for viruses. تنويه هام: هذه الرسالة الإلكترونية وأية ملحقات 
معها قد تحتوي على معلومات سرية، يجب أن لا يوزعا أو يكشف مضمونهما و/أو نسخهما 
لأي كان من دون موافقة المرسل. إذا لم تكن واحداً من الأشخاص الموجه لهم هذا 
البريد الإلكتروني ووصل إلى بريدك الإلكتروني عن طريق الخطاً، يرجى حذف الرسالة مع 
ملحقاتها فضلاً عن حذف جميع نسخها. وبعد ذلك، يرجى الإتصال بالمرسل عبر البريد 
الإلكتروني او الهاتف لإبلاغه بالخطأ الحاصل. لا تفقد سرية المعلومات أو يتنازل 
عنها بسبب خطأ ناجم عن إرسال وتوجيه البريد الالكتروني لأشخاص غير مقصودين. كما 
يتوجب على متلقي البريد الإلكتروني وملحقاته أن يتفحصوهما دوماً قبل الإطلاع 
عليهما، للتأكد من خلوهما من الفيروسات الإلكترونية الضارة.

Qatar General Electricity & Water Corporation <http://www.km.com.qa/>


[Logo]

Disclaimer:

This e-mail and any attachments may contain information which is confidential. 
They should not be distributed, disclosed or copied to anyone without the 
approval of the sender. If you are not one of the intended recipients of this 
e-mail, please delete the e-mail and any attachments, and all copies, and 
notify the sender by e-mail or telephone. Confidentiality is not waived or lost 
by mistaken communication. Before opening this e-mail or an attachment, you 
should check them for viruses. تنويه هام: هذه الرسالة الإلكترونية وأية ملحقات 
معها قد تحتوي على معلومات سرية، يجب أن لا يوزعا أو يكشف مضمونهما و/أو نسخهما 
لأي كان من دون موافقة المرسل. إذا لم تكن واحداً من الأشخاص الموجه لهم هذا 
البريد الإلكتروني ووصل إلى بريدك الإلكتروني عن طريق الخطاً، يرجى حذف الرسالة مع 
ملحقاتها فضلاً عن حذف جميع نسخها. وبعد ذلك، يرجى الإتصال بالمرسل عبر البريد 
الإلكتروني او الهاتف لإبلاغه بالخطأ الحاصل. لا تفقد سرية المعلومات أو يتنازل 
عنها بسبب خطأ ناجم عن إرسال وتوجيه البريد الالكتروني لأشخاص غير مقصودين. كما 
يتوجب على متلقي البريد الإلكتروني وملحقاته أن يتفحصوهما دوماً قبل الإطلاع 
عليهما، للتأكد من خلوهما من الفيروسات الإلكترونية الضارة.

Qatar General Electricity & Water Corporation <http://www.km.com.qa>

Reply via email to