Turn on the generator section in the output using the 'OUT_GEN' option. See 
'help mpoption' for more details on controlling the pretty-printed output.

Btw, please don't just reply to someone else's post with your own question. 
Create a new thread or reply to a post your own thread. 

-- 
Ray Zimmerman
Senior Research Associate
419A Warren Hall, Cornell University, Ithaca, NY 14853
phone: (607) 255-9645




On May 11, 2013, at 12:07 AM, Aftognosia Aftognosia <[email protected]> 
wrote:

> Dr Zimmerman
>  
> The ACOPF having 30 generators, only shows the results for some of them after 
> running runopf (....).
> The results for those that are not shown , are not zero! This is obvious by 
> the results-per-systembus, which show
> that some buses have non-zero generation, but exclusively the output of these 
> generators is not shown.
> Is there a way to see the output of all the generators ?  (e.g. one bus has 5 
> generators. But I can see the output from the bus
> and not for each of its generators).
>  
> Thank you
> John Eaftos
>  
>  
> 
> From: Ray Zimmerman <[email protected]>
> To: MATPOWER discussion forum <[email protected]> 
> Sent: Friday, May 10, 2013 3:44 PM
> Subject: Re: CLARIFICATION
> 
> So, it sounds like you want to set the SVC output based on an OPF solution. 
> Unless I'm missing something, it seems like your model should be fine.
> 
> -- 
> Ray Zimmerman
> Senior Research Associate
> 419A Warren Hall, Cornell University, Ithaca, NY 14853
> phone: (607) 255-9645
> 
> 
> 
> 
> On May 10, 2013, at 7:28 AM, Umer Ali Alsedeeq Ibrahim <[email protected]> 
> wrote:
> 
>> Dear Dr. Ray Zimmerman
>>  
>> Currently my aim is to use SVC to enhance power system security in terms of 
>> reducing branches overloading and bus voltage voilation in case contingency 
>> arise such as tripping of line or generator, later I want to find optimal 
>> location for SVC to enhance power security, so is this modeling is suitable.
>>  
>> Best Regards
>>  
>> Omer Ali
>>  
>> From: [email protected] 
>> [[email protected]] on behalf of Ray Zimmerman 
>> [[email protected]]
>> Sent: 09 May 2013 22:58
>> To: MATPOWER discussion forum
>> Subject: Re: CLARIFICATION
>> 
>> It depends how you want to operate the SVC. If you want to solve a power 
>> flow with the SVC set to maintain a set point voltage, this should be fine.
>> 
>> -- 
>> Ray Zimmerman
>> Senior Research Associate
>> 419A Warren Hall, Cornell University, Ithaca, NY 14853
>> phone: (607) 255-9645
>> 
>> 
>> 
>> 
>> On May 9, 2013, at 2:29 AM, Umer Ali Alsedeeq Ibrahim <[email protected]> 
>> wrote:
>> 
>>> Dear  Dr. Ray Zimmerman
>>>  
>>> If I want to place SVC with rating (±100MVAR) at load bus ( BUS TYPE 1)  
>>> for example at  bus#4 in the below example, the load bus shall be change to 
>>> (BUS TYPE 2 )  and in the generator data, I have to add the load bus to 
>>> generator bus with  Pmax=Pmin =0  , Qmax =100, Qmin =-100MVAR
>>>  
>>>  
>>>  
>>>  
>>> %% bus data
>>> %   bus_i   type    Pd  Qd  Gs  Bs  area    Vm  Va  baseKV  zone    Vmax    
>>> Vmin
>>> mpc.bus = [
>>>     1   3   0   0   0   0   1   1.05    0   230 1   1.05    1.05;
>>>     2   2   0   0   0   0   1   1.05    0   230 1   1.05    1.05;
>>>     3   2   0   0   0   0   1   1.07    0   230 1   1.07    1.07;
>>>     4   2   70  70  0   0   1   1   0   230 1   1.05    0.95; ( I have 
>>> change the bus from 1 to 2)
>>>     5   1   70  70  0   0   1   1   0   230 1   1.05    0.95;
>>>     6   1   70  70  0   0   1   1   0   230 1   1.05    0.95;
>>> ];
>>>  
>>>  
>>> %% generator data
>>> %   bus Pg  Qg  Qmax    Qmin    Vg  mBase   status  Pmax    Pmin    Pc1 Pc2 
>>> Qc1min  Qc1max  Qc2min  Qc2max  ramp_agc    ramp_10 ramp_30 ramp_q  apf
>>> mpc.gen = [
>>>     1   0   0   100 -100    1.05    100 1   200 50  0   0   0   0   0   0   
>>> 0   0   0   0   0;
>>>     2   50  0   100 -100    1.05    100 1   150 37.5    0   0   0   0   0   
>>> 0   0   0   0   0   0;
>>>     3   60  0   100 -100    1.07    100 1   180 45  0   0   0   0   0   0   
>>> 0   0   0   0   0;
>>>    4    0   0  100 -100   1.05    100 1    0   0  0   0   0   0   0   0   0 
>>>   0   0   0   0 ( I have put Pmax=Pmin=0
>>> ];
>>>  
>>> I have modify the case6ww data to incorporate SVC at Bus #4 as shown in bus 
>>> and generator data, please let me know whether I am in right track or not, 
>>> please help
>>>  
>>> Best Regards
>>>  
>>> Omer Ali Elsiddig Ibrahim
>>> 
>>>  
>>> Disclaimer:
>>> This e-mail and any attachments may contain information which is 
>>> confidential. They should not be distributed, disclosed or copied to anyone 
>>> without the approval of the sender. If you are not one of the intended 
>>> recipients of this e-mail, please delete the e-mail and any attachments, 
>>> and all copies, and notify the sender by e-mail or telephone. 
>>> Confidentiality is not waived or lost by mistaken communication. Before 
>>> opening this e-mail or an attachment, you should check them for viruses. 
>>> تنويه هام: هذه الرسالة الإلكترونية وأية ملحقات معها قد تحتوي على معلومات 
>>> سرية، يجب أن لا يوزعا أو يكشف مضمونهما و/أو نسخهما لأي كان من دون موافقة 
>>> المرسل. إذا لم تكن واحداً من الأشخاص الموجه لهم هذا البريد الإلكتروني ووصل 
>>> إلى بريدك الإلكتروني عن طريق الخطاً، يرجى حذف الرسالة مع ملحقاتها فضلاً عن 
>>> حذف جميع نسخها. وبعد ذلك، يرجى الإتصال بالمرسل عبر البريد الإلكتروني او 
>>> الهاتف لإبلاغه بالخطأ الحاصل. لا تفقد سرية المعلومات أو يتنازل عنها بسبب 
>>> خطأ ناجم عن إرسال وتوجيه البريد الالكتروني لأشخاص غير مقصودين. كما يتوجب 
>>> على متلقي البريد الإلكتروني وملحقاته أن يتفحصوهما دوماً قبل الإطلاع عليهما، 
>>> للتأكد من خلوهما من الفيروسات الإلكترونية الضارة.
>>> Qatar General Electricity & Water Corporation 
>>> 
>> 
>>  
>> Disclaimer:
>> This e-mail and any attachments may contain information which is 
>> confidential. They should not be distributed, disclosed or copied to anyone 
>> without the approval of the sender. If you are not one of the intended 
>> recipients of this e-mail, please delete the e-mail and any attachments, and 
>> all copies, and notify the sender by e-mail or telephone. Confidentiality is 
>> not waived or lost by mistaken communication. Before opening this e-mail or 
>> an attachment, you should check them for viruses. تنويه هام: هذه الرسالة 
>> الإلكترونية وأية ملحقات معها قد تحتوي على معلومات سرية، يجب أن لا يوزعا أو 
>> يكشف مضمونهما و/أو نسخهما لأي كان من دون موافقة المرسل. إذا لم تكن واحداً من 
>> الأشخاص الموجه لهم هذا البريد الإلكتروني ووصل إلى بريدك الإلكتروني عن طريق 
>> الخطاً، يرجى حذف الرسالة مع ملحقاتها فضلاً عن حذف جميع نسخها. وبعد ذلك، يرجى 
>> الإتصال بالمرسل عبر البريد الإلكتروني او الهاتف لإبلاغه بالخطأ الحاصل. لا 
>> تفقد سرية المعلومات أو يتنازل عنها بسبب خطأ ناجم عن إرسال وتوجيه البريد 
>> الالكتروني لأشخاص غير مقصودين. كما يتوجب على متلقي البريد الإلكتروني 
>> وملحقاته أن يتفحصوهما دوماً قبل الإطلاع عليهما، للتأكد من خلوهما من 
>> الفيروسات الإلكترونية الضارة.
>> Qatar General Electricity & Water Corporation 
>> 
> 
> 
> 

Reply via email to