Hello sir,i have to use fixed load as dispatchable load to reschedule demand 
for overload alleviation.
My question is that after running acopf, i am getting in result each 
 dispatchable load converted to fixed  generation block of 15 MW 
only. Can this block of 15 MW changed to different value?
Thanks.
Nilesh Patel

Reply via email to