Respected sir,
wt type of prices is need to consider....for shift
prices down for sending group of generators
how can we do by using this matpower software...
On Wed, Apr 1, 2015 at 6:34 PM, Ray Zimmerman <[email protected]> wrote:
> Another possible approach is to use an OPF and shift the prices down for
> the sending group of generators and up for the receiving group.
>
> Ray
>
>
> On Apr 1, 2015, at 8:02 AM, Abhyankar, Shrirang G. <[email protected]>
> wrote:
>
> Although Matpower does not have a function for ATC, it has all the
> required building blocks for doing the calculations You can take a look at
> the continuation power flow feature in the MatPower manual as a starting
> point.
>
> Shri
>
> On Apr 1, 2015, at 5:07 AM, "Aruna Dharmala" <[email protected]>
> wrote:
>
> Respected sir,
> can we do available transfer capability calculation
> using matpower it is possible..?
> if it possible in this software how the
> interfacing between two areas of available transfer capability takes place
> for group of buses
>
>
>