Notice in Figure 7-1 in the MOST User’s Manual 
<http://www.pserc.cornell.edu/matpower/docs/MOST-manual-6.0b2.pdf>, that the 
transmission lines entering bus 3, where the load is located, are constrained 
to 240 MW and 300 MW respectively. So there is no way for the network to 
deliver more than 540 MW to bus 3.

    Ray


> On Nov 22, 2016, at 9:00 AM, Gal D <[email protected]> wrote:
> 
> Hi guys,
> 
> I’m running most_ex5_mpopf.m and try to get to a situation where load 
> shedding is necessary.
> 
> For that I try to increase the load such that it will be higher than max 
> generator capacity. I've tried that using: 
> 1. Increase profile(2).values to very high values.
> 2. Decrease mpc values: mpc.gen(4, [PG PMAX]) = -2000 (450 by default).
> 
> This doesn’t help and I always seem to get -540 MW in generator 4 (the 
> dispatchable load). Where does this number come from? Is it intentional?
> I would also appreciate if someone can give a brief overview of what is the 
> relation between the profiles of most and loads of the mpc, and why does the 
> MILP objective always outputs a number that contains the full load shedding 
> penalty. 
> 
> Thanks,
> Gal
> 