I ran the "casePV3" and observed that bus 1 which is slack bus has Pg as
-3MW. Can a bus which has photovoltaic unit as generator observe real
power? I am not pretty aware of the power electronics of it. I think if you
can reason that out you may get some direction.

Regards,
Saranya A

On Thu, Nov 24, 2016 at 4:08 AM, Alexandros Gesios <
[email protected]> wrote:

> Ι made some changes in the matrices and OPF completes but I do not think
> that it allocates the reactive power among the PVs in an optimal way
> regarding the losses.
> The last three PVs absorb Qm reactive power while the other operate in a
> unity power factor.
> I attach the case in order to be more specific. Also the network is radial.
>
>
> 2016-11-23 20:46 GMT+02:00 Alexandros Gesios <[email protected]>:
>
>> Dr. Zimmerman
>>
>>
>> I applied the change you have mentioned and the result is the following:
>>
>>
>> MATPOWER Version 6.0b1, 01-Jun-2016 -- AC Optimal Power Flow
>> MATLAB Interior Point Solver -- MIPS, Version 1.2.1, 01-Jun-2016
>>  (using built-in linear solver)
>> Numerically Failed
>>
>> Did not converge in 9 iterations.
>>
>> >>>>>  Did NOT converge (0.11 seconds)  <<<<<
>>
>>
>>
>>
>> 2016-11-23 19:54 GMT+02:00 Ray Zimmerman <[email protected]>:
>>
>>> I think you want to change the first column of your gencost entries to 2
>>> (polynomial) instead of 1 (piecewise linear). Hopefully, that fixes your
>>> problem and it will solve.
>>>
>>>    Ray
>>>
>>> > On Nov 23, 2016, at 10:30 AM, Alexandros Gesios <
>>> [email protected]> wrote:
>>> >
>>> > Hello to everyone
>>> >
>>> > I am new to MATPOWER and I am trying to operate an OPF analysis in a
>>> MV grid constisted of two feeders.
>>> > The first feeder has 10 inductive loads and the second feeder has 10
>>> photovoltaic units and their are connected to the grid by the slack bus.
>>> > What I want to achieve is loss minimization by allocating the reactive
>>> power among the photovoltaic units in a optimal way. The nominal active
>>> power of the PV units is 10.6 MW and the load is 6 MW so the extra active
>>> power is being absorbed by the HV/MV Grid.
>>> > Also I want the slack bus to operate at constant 1.05 pu voltage so in
>>> the mpc.bus slack bus has voltage limits Vmax=Vmin=1.05.
>>> > Also I want the PV units to operate in nominal power so in mpc.gen
>>> their active power limits are Pmax=Pmin=Pnom.
>>> >
>>> > Finally the mpc.gencost matrix constists of 11 rows and every row has
>>> these elements     1    0       0       2       2   4; because I read in
>>> the archive that in order to achieve loss minimization you need the same
>>> linear costs in the gencost matrix.
>>> >
>>> > When I run runopf(mycase) I take the following errors
>>> >
>>> > Index exceeds matrix dimensions.
>>> >
>>> > Error in opf_setup (line 84)
>>> >   x1 = mpc.gencost(pwl1, COST+2);
>>> >
>>> > Error in opf (line 198)
>>> > om = opf_setup(mpc, mpopt);
>>> >
>>> > Error in runopf (line 75)
>>> > [r, success] = opf(casedata, mpopt);
>>> >
>>> > Also, I would like to ask whether my problem can be formulated in
>>> MATPOWER.
>>> >
>>> >
>>> > Thank you in advance
>>> >
>>> >
>>> > Alexandros Gesios
>>>
>>>
>>>
>>>
>>
>